Wednesday, January 26, 2011

My Community Activity Center

We got into the CAC today. It's still in the first stages of construction. the projected finish date is September, barring any major problems.

Here we are with our protective gear on and receiving our safety briefing.

Headed in through the backdoor from the job trailer.

Loading dock for the catering kitchen area and the restaurant/bar. 



Back hallway. On the left are 2 main rooms totalling roughly 3000 sq ft for dance studio, aerobics, yoga, etc. At the end of the hallway is the 3500 sq ft ballroom.

This is the view from the front entryway. There will be a giant stone propane fireplace from floor to ceiling made out of smooth riverstone about where they are standing. At the end are both a game room and an arcade. To the left is the bowling center, to the right the bar and restaurant with about 5000 sq ft of sitting space in the middle.

Through the future 'fun office' to my little office (200 sq ft). It does have a killer west facing window though.

The bowling lanes will go in this sunken area. You can barely see the drop wall at the back that represents the forward portion fo the pin setting mechanisms.

The building is enclosed and already maintaining heat at 60 degrees without doors, drywall, windows or interior finished in. They are on schedule if not actually slightly ahead. I will try to get more photos as it evolves.

No comments: